Fenera PV Plant



DESCRIPTION
Maracof is responsible for the design, complete construction, procurement (except for main equipment), legalization, and commissioning of a 50 MW photovoltaic facility.
The plant has 11 transformer substations, a sectionalizing station, Sungrow string inverters, a 1V dual-file tracker, and a total of 85,428 photovoltaic modules.
A total of 3,329 meters of internal roads, 16,173 driven/drilled sections, and 5,265 meters of security fencing have been built. The low-voltage trenches have a total length of 15,300 meters, the medium-voltage trenches have a total length of 2,500 meters, and the auxiliary services trench has a total length of 4,350 meters. 572,000 meters of 6 and 10 mm2 copper solar cable, 37,200 meters of 300 and 400 mm2 low-voltage aluminum cable, and 30,000 meters of 240 and 300 mm2 medium-voltage aluminum cable have been installed.