MARACOF OUR PROJECTS

Home / Projects / Warehouse for the stockage of dehydrated fodder

Warehouse for the stockage of dehydrated fodder

Year: 2017
Client: Grupo Venso
Localización: España

DESCRIPTION

This project included the execution of a 3.000 m2 stockage warehouse with 5 meter high concrete walls onver a continuous concrete footing. The volume of earthworks reached 45.000 m3 and drainage elements were placed. The construction of the warehouse allowed the client to increase its production in the Southern part of the country were it now obtains 50.000 tons of dehydrated fodder.